Please use this identifier to cite or link to this item: http://dspace2020.uniten.edu.my:8080/handle/123456789/21565
Full metadata record
DC FieldValueLanguage
dc.contributor.authorRamli M.Z.en_US
dc.contributor.authorNordin A.en_US
dc.contributor.authorRoslin N.T.en_US
dc.contributor.authorHamid N.B.en_US
dc.contributor.authorAzman N.S.en_US
dc.contributor.authorZahari N.M.en_US
dc.date.accessioned2021-12-21T02:57:34Z-
dc.date.available2021-12-21T02:57:34Z-
dc.date.issued2019-
dc.identifier.urihttp://dspace2020.uniten.edu.my:8080/handle/123456789/21565-
dc.description.abstractEvery organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situation that contractor, client, or consultant might face. Construction delay can bring bad impacts to the organization itself or the overall development of a nation. From the previous studies, there are many researchers mentioned about the causes and impacts of the construction in Malaysia. However, little effort has been made to reduce this phenomenon in housing projects. Therefore, this research is to determine the delay factors involved in housing projects and rank the delay factors and delay impacts for housing projects. The qualitative method has been used to collect the data by distributing the questionnaire survey which contains 3 sections, the first section was demographic questions, the second section was the delay factors and lastly the delay impacts. The questionnaire was distributed to 30 experts to validate the delay factors that was obtained from the literature reviews and the second stage was targeted to 151 respondents who are involved in the construction industry. Total of sixty-three delay factors were identified with a total of eight groups meanwhile, the impact of delays in construction determined were twelve. Relative Importance Index (RII) method was used to rank those delay factors and impacts. The outcome of the study highlighted the most significant delay factors which are;(1) weather condition; (2) shortage in skilled laborers due to remoteness of site location; (3) progress payment delay by client; (4) award project to lowest bid price and (5) political interference. © 2019 Author(s).en_US
dc.language.isoenen_US
dc.titleCauses of construction delay for housing projects in Malaysiaen_US
dc.typeconference paperen_US
item.cerifentitytypePublications-
item.languageiso639-1en-
item.fulltextWith Fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_5794-
item.grantfulltextreserved-
item.openairetypeconference paper-
Appears in Collections:UNITEN Ebook and Article
Files in This Item:
File Description SizeFormat 
This document is not yet available.pdf
  Restricted Access
396.12 kBAdobe PDFView/Open    Request a copy
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.