Issue Date | Title | Author(s) |
2016 | Application of Moving Bed Biofilm Reactor (MBBR) and Integrated Fixed Activated Sludge (IFAS) for Biological River Water Purification System: A Short Review | Lariyah, M.S. ; Mohiyaden, H.A. ; Hayder, G. ; Hussein, A. ; Basri, H. ; Sabri, A.F. ; Noh, M.N. |
2016 | Application of Moving Bed Biofilm Reactor (MBBR) and Integrated Fixed Activated Sludge (IFAS) for Biological River Water Purification System: A Short Review | Lariyah, M.S. ; Mohiyaden, H.A. ; Hayder, G. ; Hussein, A. ; Basri, H. ; Sabri, A.F. ; Noh, M.N. |
2014 | Floating treatment wetland as an alternative for water quality improvement: A preliminary study | Nur Asmaliza, M.N. ; Lariyah, M.S. ; Kok, K.H. ; Humaira, H.S. ; Hidayah, B. |
2014 | Implementation of dam safety management program in malaysia: From theory to practice | Lariyah, M.S. ; Hidayah, B. ; Thiruchelvam, S. ; Rahsidi, S.M. ; Azwin Zailti, A.R. ; Zuraidah, A. |
2013 | Numerical modelling dam break analysis for water supply project | Lariyah, M.S. ; Vikneswaran, M. ; Hidayah, B. ; Muda, Z.C. ; Thiruchelvam, S. ; Isham, A.K.A. ; Rohani, H. |
2013 | Performance of artificial wetland in removing contaminants from storm water under tropical climate | Asmaliza, M.N.N. ; Lariyah, M.S. ; Rozi, A. ; Aminuddin, A.G. |
2018 | Radar rainfall calibration for improved quantitative precipitation estimates in Kelantan and Terengganu river basins | Wardah, T. ; Suzana, R. ; Sazali, O. ; Hafiz, A. ; Lariyah, M.S. ; Sharmy, J. |